The Central Nebraska Public Power and Irrigation District held public hearings on the J-2 Regulating Reservoirs Project in Holdrege on November 5, 2014, and in Lexington and Elwood on November 6, 2014. The linked material includes information station displays that were presented at the public hearings, sign-in sheets for the hearings, and comments and objections that were received at the hearings.
Project Needs and Benefits Display
- Central Map
- Central Info and Facilities
- Nature and Necessity
- J-2 Project Concept
- Regulation for Hydrocycling
- Regulation for Hydrocycling Graph
- Regulation for Instream Flows
- Regulation for Target Flows Graph
- Water Service Agreement
- Johnson Lake Benefits and J-2 Water Supply
Property Acquisition Display
Engineering Display:
- Primary Project Components
- Reasons for Site Selection
- Geotechnical Data and Fine Grained Thickness
- Dam and Reservoir Cross-Section
- Reservoir No. 2 Outlet Design
- Projected Schedule
Before and After Depictions Display
- View Locations Map
- View 1
- View 1 Simulation
- View 2
- View 2b Simulation
- View 2c Simulation
- View 3
- View 3 Simulation
- View 5
- View 5 Simulation
- View 7
- View 7 Simulation
Federal Permitting:
Sign-In Sheets and Public Comments and Objections
- Welcome Sheet
- Holdrege Sign-In Sheet
- Lexington Sign-In Sheet
- Elwood Sign-In Sheet
- Written Comments and Objections
- Transcription of Recorded Verbal Comments and Objections
**These comments and objections were received at the public hearings and are being considered by The Central Nebraska Public Power and Irrigation District.**
Leave a Reply